This version of the case study is no longer available. View latest
OVERVIEW
The Grange University Hospital was opened ahead of schedule in November 2020 to meet the winter season pressures exacerbated by Covid-19 second wave. The largest area of hard landscape is outside the main front entrance and includes a pedestrian concourse, bicycle storage, bus stop and a one-way vehicle looped driveway, all constructed as a bound modular pavement.
tufftop 40MPa, High Performance, Optimal Viscosity, Jointing Mortar - BS7533-101 Type 40 jointing mortar
Leicester Square.
Luton Town Centre.
One Tower Bridge
Hull City of Culture 2017
Wandsworth - Osiers Road, Residential Bound Permeable natural stone pavement
Hackney - Daubeney Road, Residential Bound Permeable Pavement
UltraScape flowpoint used at beautiful and historic Citadelle of Namur
UltraScape paves the 'Greenest City' in Europe