NBS Source
I'm a manufacturer

This case study is no longer available.

Thames Tideway Central, Kirtling Street

OVERVIEW

Tideway Central is part of Thames Tideway Tunnel, which is a new enhanced sewer system currently being built in London that will help protect the River Thames by tackling the problem of overflows from the capital’s Victorian sewer. Kirtling Street is Tideway Central’s biggest site, bringing London’s sewer system into the 21st century as well as creating thousands of jobs and helping to boost the economy.

FLo Environmental Manager, Camila Bernal and FLo Section Engineer, Claire Kilrane expressed a desire to utilise Cemfree in an on-site trial, after learning about the potential carbon savings that could be made with this innovative product. It was decided that two hoarding post bases would be the ideal application for Cemfree to observe what it is like to mix, place and cure and how it performs in comparison to traditional concrete.

No featured products in this case study

Contact PUDLO Waterproof Systems & Cemfree Zero-Cement Concrete, part of the DB Group Ltd by clicking the button below to find out which products were used in this case study.