You are viewing content for United Kingdom.

Choose a country to see content for your location. Changing region will navigate you to the homepage.

NBS Source
I'm a manufacturer

Terrace | Bespoke composite decking | Hidden fixings | Offices | London

OVERVIEW

Google HQ terraces upgraded with bespoke composite decking.

The building features expansive external floor space across multiple levels. Bespoke solid section 230 x 30 mm composite decking was installed, with all fixings hidden for a seamless finish and clean lines.

The main terrace areas are level and by using the Buzon DPH slope correction system, the wheelchair access ramps were easily achieved.

A clever feature; the building maintenance unit travels over the decking, hiding the steel rails below. This enlarges the overall usable terrace space considerably, and gives uninterrupted views from the entire terrace.

No featured products in this case study

Contact The Outdoor Deck Company Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from The Outdoor Deck Company Ltd

View inspiration
Kew Bridge, London

Kew Bridge, London

Battersea Power Station, London

Battersea Power Station, London

White City Place, London

White City Place, London

One Tower Bridge, London

One Tower Bridge, London