Job type: SE & U Duct Project Length: 1 day Completed by: Kompozit’all UK Initial Situation: University College London’s Chemical duct from the chemical cabinet was leaking. The duct was located in a service riser with no access from the floors of the building. Project Challenge: To reline the duct without need to access ductwork through the building. Liner Chosen: FuranFlex 25 Black Result: The duct was successfully relined with FuranFlex Black. Access was only required at each end of the duct. The works were completed in 5 hours with minimal disruption to the building.