NBS Source
I'm a manufacturer

Sandy Park Hotel

OVERVIEW

Sigmat delivered an all-encompassing offsite MMC solution including; 4 levels of hot rolled steel transfer structure with Sigmat's own SFS infill, 5 levels of Sigmat light gauge steel framing with 180mm concrete slabs over SigDeck, roofing, lift / stair cores and stair cases.


Alongside additional architectural features such as vertical aluminium brise soleil which helps to manage heat and light, the heart of the scheme also includes a bespoke hot rolled glazed link bridge offering seamless access from the hotel to nearby Sandy Park stadium.


The new Courtyard by Marriott Hotel is the largest commercial hotel in the region with 250 bedrooms, ground floor leisure facilities and a spectacular roof top cocktail bar.

No featured products in this case study

Contact Sigmat Limited by clicking the button below to find out which products were used in this case study.

More case studies from Sigmat Limited

View all case studies (2)
South Accommodation Road

South Accommodation Road