Sage Building, Newcastle The £80 million offices of the Sage Group plc in Gosforth, Newcastle upon Tyne, included a massive 250,000 Yorkshire integral solder ring fittings. The fittings – manufactured from copper or copper alloy - were used exclusively throughout the building in sizes from 15mm to 54mm. The massive scale of the project meant up to 80 plumbers and fittings were installing Yorkshire integral solder ring products at any one time.
Contact Pegler Yorkshire by clicking the button below to find out which products were used in this case study.
LOCAL AUTHORITY - TECTITE FLEXIBLE
Garnock Education Campus
Broadmoor Hospital
Trinity Square