Challenge


Work is underway to create a new theatre that will transform the existing 1932 Royal Shakespeare Theatre whilst retaining the original Art Deco and Victorian elements of the building. Due for completion during 2010, the theatre will give artists and audiences alike the best environment in which to perform and enjoy Shakespeare with improved public spaces both inside and surrounding the theatre.


The challenge for the project design is to blend the key aspects of the existing buildings with the new theatre designs. Specialist roofing contractor, Varla (UK) Limited were awarded the contract to design, manufacture and install the zinc standing seam roof and wall package. Varla (UK) Limited challenged Knauf Insulation to propose a solution to meet the demanding specification for this unique project.


Solution


Knauf Insulation provided detailed ongoing technical support during the design stages of the project and proposed solutions based on the results of unique three-dimensional heat loss calculations. The unique 3-D calculation support service, provided by the Technical Advisory Centre, was an integral part of the product specification process to ensure that the exact thickness recommendations were proposed in order to meet the project’s specific U-value requirements.


Knauf Insulation were able to provide a solution that met all of Varla’s insulation requirements by using 160mm of Knauf Insulation FactoryClad Roll 32. This is a flexible, lightweight roll of resilient Glass Mineral Wool with exceptionally high tear strength and a thermal conductivity of just 0.032 W/mK.


In addition, Knauf Insulation FactoryClad Roll 32, recommended for this project, is manufactured from Glass Mineral Wool, which is ideal for limiting the spread of fire since it holds a Euroclass A1 reaction to fire classification for non-combustibility. The product will not burn, will not give off toxic smoke nor will it suddenly ignite in a fire due to ‘flashover’. For public buildings such as this, superior fire performance is crucial.

Products featured in this case study

View all products (50)
Knauf Insulation - FactoryClad Roll 32 (Uncut) - Built-Up Metal Roof and Wall Insulation

Knauf Insulation - FactoryClad Roll 32 (Uncut) - Built-Up Metal Roof and Wall Insulation

More case studies from Knauf Insulation Ltd

View all case studies (49)
Agar Grove, London

Agar Grove, London

A3 New Bailey, Manchester

A3 New Bailey, Manchester

Priscilla Bacon Lodge, Norfolk

Priscilla Bacon Lodge, Norfolk

Harpercrewe Partnership

Harpercrewe Partnership

More case studies from Mineral wool insulation

View all case studies (41)
A3 New Bailey, Manchester

A3 New Bailey, Manchester

Oak Cancer Centre, Royal Marsden Hospital

Oak Cancer Centre, Royal Marsden Hospital

The Queen's Terminal - Heathrow Airport T2

The Queen's Terminal - Heathrow Airport T2

Marks & Spencer, Cheshire Oaks

Marks & Spencer, Cheshire Oaks