ROSALIND FRANKLIN LABORATORY, LEAMINGTON SPA

OVERVIEW

BACKGROUND


As part of its response to Covid-19, the UK Health Security Agency (UKHSA) commissioned a globally important ‘mega lab’, the largest of its kind in the UK, to be delivered on a fast-track schedule. The facility would offer world-leading testing and diagnostic capabilities.


BRIEF


MIDDAS worked with Mace, WSP and HOK to design a freestanding structure as an ideal solution. The project was delivered by Tier 1 contractor Balfour Beatty, with MIDDAS appointed to manufacture the freestanding structures, laboratory partitioning, door sets, vision panels and walk-on service deck. The laboratory lines would be constructed within an existing lightweight steel frame building, so the ability for M&E services to be supported from the MIDDAS structure was a critical factor. This ensured no load was added to the building structure’s framework and eliminated the need for any structural modifications.


SOLUTION


MIDDAS provided its M100 bi-panel wall system and associated structural framework as a purpose designed freestanding structure, configured in a variety of specifications. The laboratory environments were designed to operate at negative pressure, with third party MEP and ceiling system supported off the structure. A walk-on service deck provided maintenance access across the complete structure, with built-in edge protection at the perimeter of the facility.


CLIENT QUOTE


"MIDDAS were identified as our key supplier based on their delivery of previous fast-track freestanding healthcare projects and prefabricated system build solutions. They were able to meet every challenging technical requirement we put forward and still deliver to the super accelerated, time-critical programme of works."

Frank Randles, Business Unit Director, Pharma & Life Sciences, Mace

Products featured in this case study

View all products (13)
M200 Door Sets

M200 Door Sets

M100 Bi-Panel Relocatable Partition (100mm)

M100 Bi-Panel Relocatable Partition (100mm)

M100 Integrated Vision Panels

M100 Integrated Vision Panels

M100 Door Sets

M100 Door Sets

More case studies from MIDDAS

View all case studies (14)
BAYER PHARMACEUTICALS

BAYER PHARMACEUTICALS

BUPA CROMWELL HOSPITAL LONDON

BUPA CROMWELL HOSPITAL LONDON

OXFORD NANOPORE TECHNOLOGIES, HARWELL SCIENCE & INNOVATION CAMPUS

OXFORD NANOPORE TECHNOLOGIES, HARWELL SCIENCE & INNOVATION CAMPUS

PORT OF HARWICH, ESSEX

PORT OF HARWICH, ESSEX

More case studies from Carbon steel doorsets

View all case studies (80)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

Glasgow Royal Infirmary University Tower for NHS

Glasgow Royal Infirmary University Tower for NHS

More case studies from Partition panels

View all case studies (61)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

cGMP Global Packing Centre for AstraZeneca

cGMP Global Packing Centre for AstraZeneca