by IKO PLC
IKO worked with installing contractors BriggsAmasco to refine the roof specification and recommended IKO’s Mach One single layer bituminous membrane system, installed to the recommendations of wind uplift calculations and performing to a 0.18U value as per requirements.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station