by IKO PLC
The major route in and out of the Port of Tilbury sustains daily, continual heavy HGV traffic which can deteriorate road joints. A cost effective solution was required, with minimum disruption to all road users. The IKO Permatrack H Bridge Joints were chosen for their proven track record on numerous other joints installed on the UK’s motorway network.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station