by IKO PLC
Perry Hall Academy, a large primary school built in 1949, with original waterproofing still in-situ. IKO assisted the Academy funding bid by providing a detailed survey report, including intrusive core sample analysis. The roofs were suffering from water ingress, cracks in the mastic asphalt, pooled water and poor heat retention, so decision was made to replace the roofs throughout. New rooflights were also specified to allow more natural light in while the design chosen reduced the external noise transmission. IKO worked with specifier Concept Education Services to deliver the project (some work during term-time) within 6 months.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station