by IKO PLC
Three flat roofs that were beyond serviceable have had their roof surface and insulation refurbished with a tapered scheme in order to eliminate water pooling which was a consistent problem.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station