NBS Source
I'm a manufacturer

This case study is no longer available.

Ragdale Hall, Melton Mowbray

OVERVIEW

Here at HMS we have recently seen the completion of Ragdale Hall in Melton Mowbray being reached after nearly two weeks and a couple of rather soggy days! In the end over 820m² of Decra®Set porous resin bound paving has been installed, using a 6mm Natural Buff blend to finish. The SUDS compliant porous nature of the product will mean that standing water and ponding should be all but 100% eliminated without the requirement for costly and on occasions unsightly additional drainage provision.

No featured products in this case study

Contact HMS Decorative Surfacing Limited by clicking the button below to find out which products were used in this case study.

More case studies from HMS Decorative Surfacing Limited

View all case studies (9)
Projects completed in May 2022

Projects completed in May 2022

Projects completed in March 2022

Projects completed in March 2022

What a month we had in June!

What a month we had in June!

July saw record temperatures, but that didn't stop HMS

July saw record temperatures, but that didn't stop HMS