by CCL Wetrooms
The award winning Pure Gym brand required a waterproofing solution for the shower cubicles in their new Southampton gymnasium. The shower blocks needed to be fully waterproofed and appropriate drainage systems installed, capable of coping with continuous flow rates of 24 L/min. Modular Wet-Floor Systems were specified for the timber floors and floor formers were butted together and installed side by side, creating individual falls towards the contemporary linear drains. In addition, floor formers were installed alongside the cubicles resulting in the whole shower area being laid to fall.
Contact CCL Wetrooms by clicking the button below to find out which products were used in this case study.
Waterproofing and Drainage Solutions for Octagon Developments' luxury country mansion in Virginia Water
The Savoy Hotel
Malmaison, Boutique Hotel London
The Glade, Ascot