Pure Gym

by CCL Building Products Ltd

The award winning Pure Gym brand required a waterproofing solution for the shower cubicles in their new Southampton gymnasium. The shower blocks needed to be fully waterproofed and appropriate drainage systems installed, capable of coping with continuous flow rates of 24 L/min. Modular Wet-Floor Systems were specified for the timber floors and floor formers were butted together and installed side by side, creating individual falls towards the contemporary linear drains. In addition, floor formers were installed alongside the cubicles resulting in the whole shower area being laid to fall.

No featured products in this case study

Contact CCL Building Products Ltd by clicking the button below to find out which products were used in this case study.

More case studies from CCL Building Products Ltd

View all case studies(21)
Waterproofing and Drainage Solutions for Octagon Developments' luxury country mansion in Virginia Water

Waterproofing and Drainage Solutions for Octagon Developments' luxury country mansion in Virginia Water

The Savoy Hotel

The Savoy Hotel

Malmaison, Boutique Hotel London

Malmaison, Boutique Hotel London

The Glade, Ascot

The Glade, Ascot