by T-T
One of the UK's largest Turf Growers with over a 2000 acre farm, recently contacted T-T to assist in the supply of bespoke pumping equipment. T-T were contracted to design a control panel to operate two contractors' KRS 2-69 pumps, via a generator as the pumps were to be situated in a remote area. Being installed into an existing concrete chamber, the pumps also had a requirement to be duty assist in order to deal with heavy rainfall. From the initial concept through to completion, the proj…
Show moreContact T-T by clicking the button below to find out which products were used in this case study.
T-T Project's supply 11 pumping stations