You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
Nuffield Hospital Leeds required the replacement of six timber door sets serving their operating theatres—three per floor—without disrupting theatre schedules or compromising hygiene standards. A survey was completed during the evening to avoid operational impact, and the full installation was delivered over two weeks.
Contact Dortek Ltd by clicking the button below to find out which products were used in this case study.
An innovative design for Great Ormond Street Hospital, London
Improved safety and efficiency for Scottish Salmon, Scotland
Specialist hygienic door design for Cambridge Biomedical Campus (CBC)
An energy efficient design for The Royal Liverpool University Hospital