NBS Source
I'm a manufacturer

Nine Elms, London

OVERVIEW

A recently completed residential complex in the centre of London is where you will find this magnificent building which has been finished to the highest standard. The reception area is welcomed by a circular entrance with a pool of water at the centre. The stone that's been used is a pale cream and the metal work is a light bronze. We provided the pull door handles which complement the colours and materials used. The have been finished in a dark bronze adding a dramatic entrance across the front of the building and on the main entrance. You can find a range of finishes which we offer across a range of products. The front of the building benefits from planted up areas which breaks up the hard lines, this along with the curved stone seated areas creates a pleasant place to sit and sip a coffee. There have also made great use of lighting in the main lobby area and the reception is grand and welcoming. The style of our handles used are Ash 103.

Products featured in this case study

View all products (27)
Pull Handle Cranked D ASH103  - Pull Handle

Pull Handle Cranked D ASH103 - Pull Handle

More case studies from ASH Door Furniture & Entrance Specialists Ltd

View all case studies (9)
Superdry, Oxford Street (ASH258)

Superdry, Oxford Street (ASH258)

Hard Rock Hotel, London

Hard Rock Hotel, London

Vivienne Westwood, Nottingham

Vivienne Westwood, Nottingham

Auriens, Chelsea

Auriens, Chelsea

More case studies from Pull handles

View all case studies (29)
BSF concept store

BSF concept store

Cambridge Central Mosque

Cambridge Central Mosque

The Black Diamond

The Black Diamond

The Manzoni

The Manzoni