OVERVIEW
Lionweld Kennedy supplied open mesh flooring, handrails, stairs and removeable chains to the Hitachi Rail Facility in Aycliffe Industrial Estate.
We supplied three 250 metre long inspection walkways and eighteen 27 metre long access platforms around their 460,000 sq ft factory.
Hitatchi have been involved in the HS2 development, designing, building and delivering a fleet of bespoke high speed trains.
Their new installation helps the team to be proactive with their work, ensuring their health and safety at all times with ball-proof grating.
Handrail Tubular Stanchions
Steel Stair Treads - 35mm Ball Proof - Open Steel Grating
Safegrid Forge Welded Steel Grating - 20mm Ball Proof - Steel Grating and Open Mesh Flooring
Steel Stair Treads - 20mm Ball Proof - Open Steel Grating
Chirag Oil Field
GDF Suez Cygnus Bravo
Shah Deniz
Solan Topside
Stauning Whisky’s distillery - gratings
New Air BP Jet Fuel Station - plank gratings
HMS Victory - plank gratings
Platforms and stairs for grandstand systems - plank gratings
ASF 5006 Handrailing at Bradford Library Steps
ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall
White City, London. Illuminated handrailing
Hilton Garden Inn, Terminal 2, Heathrow Airport
New Air BP Jet Fuel Station - plank gratings
Chirag Oil Field
Clair Ridge Oil Field
North Pole Depot