The Olympic stadium had a capacity of 80,000 during the Olympics and Paralympics. It will be reduced in capacity to 25,000 for the future and will become West Ham United F.C's new permanent home. Designed by Populous Architects and contracted to McAlpine, it took over three years to build. Along with 10,700 tonnes of steel and thousands of cubic metres of low-carbondioxide concrete, there are many Naylor Concrete Hi-Spec, Fair Faced and Fire Resistant Lintels in the building, supplied through Civils and Lintels to Essex based Brickwork Contractor, Galostar.
Contact Naylor Concrete Products Ltd by clicking the button below to find out which products were used in this case study.