NBS Source
I'm a manufacturer

This case study is no longer available.

Mount Vernon Hospital, Hillingdon

OVERVIEW

Extensive flooding was occurring prior to works downstream of the hospital. The project needed to reduce both total and peak flows. A multi-stage sustainable water treatment system was proposed, combining a number of techniques such as porous asphalt, swales, French drains and attenuation basins.

No featured products in this case study

Contact Aggregate Industries - Asphalt by clicking the button below to find out which products were used in this case study.