The Verberckmoes furniture store in Sint-Gillis-Waas (Belgium) is fully focused on retail sales. That’s why the company decided to double the warehouse space at its collection centre to 3600 m2 by adding an extra floor. For the base boards, Nolte Opslag Systemen worked, as always, with material from UNILIN, in this case Mezzanine U7 boards. The new mezzanine floor was constructed in less than three weeks.