Fresh Wharf is being developed by Countryside, in partnership with housing association Notting Hill Genesis on a 10-acre, former brownfield site situated along the banks of the River Roding. Demolition of old premises on the site started in early 2018 and Phase 1 of the construction project commenced later that year. After this, construction of the new properties commenced in earnest, with the apartment blocks and townhouses being constructed. Installation was undertaken by sub-contractor, Stanmore, with Metsec using Revit to create the construction level design for the framing system at the early stages of the project’s conceptualisation.
Metsec SFS Infill Wall with Versaliner Sheathing Board and Siniat Lining
Metsec SFS Infill Wall with Y-Wall Sheathing Board and Knauf Lining
Metsec SFS Infill Wall with Versaliner Sheathing Board and British Gypsum Lining
Metsec SFS Infill Wall with Glasroc X Sheathing Board and British Gypsum Lining
Metsec SFS Infill Wall with Versaliner Sheathing Board and Knauf Lining
Metsec SFS Infill Wall with Y-Wall Sheathing Board and Siniat Lining
Metsec SFS Infill Wall with Weather Defence Sheathing Board and British Gypsum Lining
Metsec SFS Infill Wall with Y-Wall Sheathing Board and British Gypsum Lining
Metsec’s SFS steel framing system has helped to create a seamless finish to the façade of a new state-of-the-art custody centre and strategic policing hub for Devon and Cornwall Constabulary.