NBS Source
I'm a manufacturer

This case study is no longer available.

Long Term Solution for Troublesome A55 Manhole Covers

OVERVIEW

IKO approved contractor and highway repair specialist, RAB Associates (UK) Ltd, removed the cast iron cover and frames, and removed residual material such as loosened brickwork. The surrounding distressed road surfacing was also removed. Then, using IKO Permatrack Compounds, the re-bedding to match adjacent levels of the previous items was quickly completed. The repair was finished using IKO Permatrack and pre-coated high PSV chippings to fill the surrounding void to match the existing road levels.

No featured products in this case study

Contact IKO UK by clicking the button below to find out which products were used in this case study.