by IKO PLC
IKOslate was chosen by the client (Walsall MBC) as a low weight, cost effective alternative. The products CO2 credentials were also a key factor. During the installation IKO Rubershield Pro and IKO Armourvent were also installed to provide cross flow ventilation, and IKO’s lead substitute IKOflash was installed in the valleys and for flashing the chimneys. The steep pitch of the roof provided the contractor with a challenge particularly with the cold damp Autumn mornings.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.