by IKO PLC
The project involved treatment of longitudinal and transverse cracking in lanes 1 and 2 of the carriageway. IKO Permatrack H (High Modulus) Inlaid Crack Repair System was installed as a solution to a reflective crack extending to a length of 6.7km and IKO Permatrack Samiband was used to repair over 3km of transverse cracking in the carriageway .
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station