The project involved treatment of longitudinal and transverse cracking in lanes 1 and 2 of the carriageway. IKO Permatrack H (High Modulus) Inlaid Crack Repair System was installed as a solution to a reflective crack extending to a length of 6.7km and IKO Permatrack Samiband was used to repair over 3km of transverse cracking in the carriageway .