NBS Source
I'm a manufacturer

Improving road drainage on the A7

OVERVIEW

With a poor accident record, the initial project on the 2.3 km upgrade of the A7 Auchenrivock route, south of Langholm was to improve and increase the number of overtaking opportunities of the roadway, while incorporating the need of cyclists and pedestrians, the water management needs of the scheme, including surface water runoff had to be taken into consideration.

Products featured in this case study

View all products (42)
Downstream Defender Select - Hydrodynamic vortex separator

Downstream Defender Select - Hydrodynamic vortex separator

More case studies from Marshalls Civils & Drainage

View all case studies (12)
A259 Hastings

A259 Hastings

M1 Junctions 28 - 31

M1 Junctions 28 - 31

Hitachi Train Factory, County Durham

Hitachi Train Factory, County Durham

M1 Junction 28 - 31, Nottinghamshire

M1 Junction 28 - 31, Nottinghamshire