IKO Polimar CRS used for Trimpley Water Treatment

OVERVIEW

The IKO Cladding Refurbishment System (CRS) was chosen, extending the life expectancy of the roofs with a 10 year guarantee from IKO PLC. The existing coating was de-bonding from the plastisol sheets with bare metal showing in places, signs of water damage prior to rusting. Sections of ridge flashings had worked their way loose and were missing from several locations on three of the roofs

Products featured in this case study

View all products (38)
Cold Applied Liquid for Roofs, Balconies & Terraces - IKO Metatech

Cold Applied Liquid for Roofs, Balconies & Terraces - IKO Metatech

More case studies from Liquid-applied inverted roof covering systems

View all case studies (7)
Crossrail Place

Crossrail Place

Library of Birmingham

Library of Birmingham

Morris Blitz Court

Morris Blitz Court

Case Study - Proteus Pro-BW® Plus - Knolly's House

Case Study - Proteus Pro-BW® Plus - Knolly's House