NBS Source
I'm a manufacturer

This case study is no longer available.

HSE Headquarters

OVERVIEW

Astralux Systems dealer, Pentel Contracts, were involved with the architect and contractor some two years before the first piece of ground was broken on site at the headquarters of the Health & Safety Executive. The Astralux 5000 tensioned roller blind system is a proven solution for atria installations and was used at this site to control glare and heat to both the main atrium, 13m from floor level and a circular rooflight. In total 140 blind systems were installed covering an area of glazing of some 2,500 square metres. Operation was by localised group operation with radio controlled (wireless) switches.

No featured products in this case study

Contact Astralux Blind System by clicking the button below to find out which products were used in this case study.