Horsham Cycle Hub

OVERVIEW

This Cycle Hub at Horsham Station is the third Hub that Cyclepods have installed for Southern Rail as part of their Cycle Provision Scheme. The Hub has 130 bike spaces using the Easylift+ two-tier storage system and is fully equipped with CCTV, Bike Pump & Repair Stand, Motion Sensor Lighting and Secure Access Control System and push release exit.