Job type: Leaking Chimney Project Length: 1 day Completed by: Old Mill Chimneys Initial Situation: A leaking chimney at A 1000-year-old church meant that a new liner was required. The chimney would not accept stainless steel lining. Project Challenge: Maintain adequate cross-sectional area. Future proof the chimney for the new boiler plant. Ensure no damage to the building Liner Chosen: FuranFlex 25 Black Result: FuranFlex 25 Black liner of the correct dimensions was installed. It is gas and water-tight to ensure suitable for high efficiency or condensing appliances. Installation completed on time and within budget.