This case study is no longer available —
Pecafil® has been used extensively worldwide for over 30 years, as a trusted permanent formwork, for the construction of many different foundation types on major projects. The use of Pecafil® on this project avoided the need for heavy traditional formwork and enabled a quick and simple installation process. Frank fibre concrete bar spacers were also used to ensure that the correct cover was maintained. Pecavoid® was specially manufactured by Max Frank for this project, to incorporate a recessed channel, to allow drainage between cells. Max Frank successfully supplied all materials on-time to comply with specific site requirements.
Contact MAX FRANK Ltd by clicking the button below to find out which products were used in this case study.