NBS Source
List your products

HDS Heated ramp system installed at “The Halley” in Finchley.

by Heated Driveway Systems Ltd.

  Favourite

‘A Boutique collection of executive apartments on a tree-lined Avenue, with secure underground parking’. HDS was contracted to supply and help with the installation of an Ice and snow melting system, to give safe access from the underground carpark up to street level. The developer wanted the full width of the ramp heated, so HDS 4455W driveway heating cables were fitted on top of the concrete reinforcement bars, before the ramp construction was completed. The heated ramp is controlled by an HDS ice and snow melting control, with 2 ground/moisture sensors and one air temperature sensor.

Read more

No featured products in this case study

Contact Heated Driveway Systems Ltd. by clicking the button below to find out which products were used in this case study.

More case studies from Heated Driveway Systems Ltd.

View all case studies from Heated Driveway Systems Ltd. (6)