Greater Manchester Major Trauma Hospital

OVERVIEW

The new Greater Manchester Major Trauma Hospital at Salford Royal Hospital, part of the Northern Care Alliance NHS Foundation Trust, is set to provide much needed additional capacity to care for and treat major trauma patients. 


BAM were appointed to lead the construction of the new facility as part of the Government’s New Hospital Programme. The project required completion of a building within both the Guaranteed Maximum Price (GMP) and the tight programme timescales due to the urgent need for extra capacity.


With the hospital committed to achieve an 80% reduction in the carbon emissions they directly control by 2028 – 2032, it was also essential that the facility was well insulated to reduce the demand on its heating systems. To deliver this, whilst meeting the project requirements for a European Classification (Euroclass) A1 or A2 rated façade insulation, K-Roc Rainscreen Slab was fitted as part of the building’s rainscreen façade.

No featured products in this case study

Contact Kingspan Insulation by clicking the button below to find out which products were used in this case study.

More inspiration from Kingspan Insulation

View inspiration
Kingspan Insulation rises to the challenge of water tower renovation

Kingspan Insulation rises to the challenge of water tower renovation

Kingspan TEK travels through time at Seaton Jurassic

Kingspan TEK travels through time at Seaton Jurassic

Royal Military Academy given luxury finish with Kingspan OPTIM-R

Royal Military Academy given luxury finish with Kingspan OPTIM-R

Kingspan insulates beachfront Grand Design

Kingspan insulates beachfront Grand Design