OVERVIEW
Case Study: Google – Watermarque Building, Dublin
BIOTRAP® NS35 Grease Management System + Grey Water Holding Tank + Lifting Pump
Project Overview
Google required a high-performance grease management solution for a new staff kitchen in the Watermarque Building, Dublin. The kitchen produces approximately 2,000 meals per day, creating significant volumes of FOG-laden wastewater. Compliance with Irish Water discharge limits and elimination of odour risk were key priorities. The installation location—a basement car park plant area—required a compact, robust and easily maintainable system.
Client Requirements
Solution Delivered
TaylorMade Greasetrap Solutions supplied and installed a complete BIOTRAP® system, including:
The BIOTRAP® NS35 was selected due to:
Coordination & Installation
TaylorMade coordinated directly with the Principal Contractor, building management, and kitchen designers throughout the project.
Performance & Results
The system was installed in 2019 and has now operated for several years with no malodours, no blockages and zero compliance issues. There have been:
Google and their consulting engineers provided extremely positive feedback on the performance and maintainability of the installation. As a result, TaylorMade have since been specified for four additional Google buildings in Dublin.
Key Benefits Delivered