Macs Automated Bollard Systems successfully completed the installation of the automatic rising bollard system at Gloucester Cathedral. Used to control and restrict traffic flow through the gates and into the Cathedral Green, the bollard system is operated in several ways. With the Cathedral being open to the public 365 days a year, the reliability of the bollard system was of the upmost importance, and Macs commitment to customer satisfaction meant we were able to deliver the product, and reliability, the project required.
No featured products in this case study
Contact Macs Automated Bollard Systems Ltd by clicking the button below to find out which
products were used in this case study.