Flame-Free Roofing System Supplied Due to Sensitive Contents
OVERVIEW
No timber was allowed as part of the new refurb to conform to FM Global (Airbus Insurers) regarding system fire rating.
IKO recommended an overlay on the existing deck, which complied with all the latest British Standards and Regulations.
IKO Mach One System was chosen as it provided a flame-free System. Where detailing was difficult IKO Polimar EC/UV System was used. The roof refurbishment also included the installation of smoke vents, associated smoke control panels and accessories.
No featured products in this case study
Contact IKO PLC by clicking the button below to find out which
products were used in this case study.