Flame-Free Roofing System Supplied Due to Sensitive Contents

by IKO PLC

No timber was allowed as part of the new refurb to conform to FM Global (Airbus Insurers) regarding system fire rating. IKO recommended an overlay on the existing deck, which complied with all the latest British Standards and Regulations. IKO Mach One System was chosen as it provided a flame-free System. Where detailing was difficult IKO Polimar EC/UV System was used. The roof refurbishment also included the installation of smoke vents, associated smoke control panels and accessories.

No featured products in this case study

Contact IKO PLC by clicking the button below to find out which products were used in this case study.

More case studies from IKO PLC

View all case studies(84)
Portslade Academy - IKO Ultra Prevent

Portslade Academy - IKO Ultra Prevent

Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV

Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV

Westminster Cathedral (Carbon Neutral) - IKO Permaphalt

Westminster Cathedral (Carbon Neutral) - IKO Permaphalt

Replacing the 55,000m2 Roof Area at Euston Station

Replacing the 55,000m2 Roof Area at Euston Station