NBS Source
I'm a manufacturer

This case study is no longer available.

Fixed Power Clusters For ACC Liverpool

OVERVIEW

ACC Liverpool reached out to extend its exhibition hall space in late 2015. The complex turned to IDE to produce a single point distribution system to provide power to the 8100 square metres of event space. Due to the stage constraints, Fixed Power Clusters were identified as the solution to cater to ACC Liverpool’s needs. To find out more about our solution, click on our case study attached.

No featured products in this case study

Contact IDE Systems by clicking the button below to find out which products were used in this case study.