When the 2012 Olympics design team wanted a third party accredited firestop, with tested high acoustic performance, to close the movement cavity between the rear of the facade and the partitions and floor slabs, SIDERISE was their only choice. For London’s most prestigious event they demanded that performance levels for the Athletes Village not only met, but exceeded the criteria demanded by Building Regulations ‘Approved Document E’.
Contact Siderise Group by clicking the button below to find out which products were used in this case study.
Delivering an impressive acoustic performance at World Class Arena
Bringing noise control to new levels at One Hyde Park
One St Peter's Square