OVERVIEW
The Project
The former Met Police HQ which has been redeveloped into a co-working space based on the banks of the Thames. Tintagel House boasts modern design co-working spaces, meeting rooms, roof terraces, bar, cafe, gym and cycle storage for its members. Bellsure were asked by Oakmont Construction to provide the cycle storage for this project.
As requested by Oakmont Construction, we provided quotes on bespoke cycle shelters with a selection of cycle storage for the client. We also supplied CAD designs and .dwg files to build into the clients BIM model. The CAD files that Bellsure provided included specified materials, product recommendations, panel details and security fixings.
The Solution
The Streetsure team secured the contract and project managed the supply of the shelters and cycle storage to suit the contractors time frame and budget.
For the cycle storage we supplied our Classic double decker cycle racks, Verti-45 semi vertical cycle racks and classic Citihoop stands. These were space planned strategically to fit as many spaces into the area as possible, and provide a greater return on investment for our client.
Our bespoke CuvaSpan cycle shelters were the chosen option for this project. The shelter was a bespoke powder-coated steel frame with a PETG roof.
Our installers worked alongside the site manager to ensure a smooth snag free handover - complete with an enhanced operations & maintenance manual.
Verti 45 (Semi Vertical) - Cycle storage
Two-Tier Cycle Racks for Network Rail, London
Cycle Racks, Postal Boxes and Bike Service Station for Mapleton Crescent, London
Timber Compound Shelter and Cycle Racks at Hallsville Quarter, London
Vertical Cycle Stands for University of Edinburgh
The Kingsbrook School, Aylesbury
Manchester University NHS Foundation Trust
Etihad Campus, Manchester