NBS Source
I'm a manufacturer

This case study is no longer available.

Cubric

OVERVIEW

Procter Contracts were engaged in the manufacture and install of the purpose made balustrade rails to the entrance of the front new building.Install only galvanised screening to the boundary area. Also, to provide a timber refuse area, and ad hoc purpose made cycle store to provide a secure area for cycles.

No featured products in this case study

Contact Procter Contracts by clicking the button below to find out which products were used in this case study.