by IKO PLC
A detailed visual and physical inspection, together with core and moisture probe analysis carried out by IKO on the roof, patio and walkway areas, indicated that the waterproofing membrane was in a condition commensurate with the age and the type of the traditional membranes installed. They had become fragile and brittle. The decks were saturated due to water ingress, and natural ageing had played a principle part in the deterioration of the waterproofing system. The build-up would not have met the requirements of the current building regulations Part L. IKO worked to refine the specification for the main roof,