NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Clydebank Health Centre - Healthcare

OVERVIEW

Clydebank Health Centre is a new £19m health facility being delivered in partnership with hub West Scotland on behalf of NHS Great Glasgow & Clyde. This new health hub is located within the Queens Quay development area forming part of a new Health Quarter designed to bring together six local GP practices to serve 40,000 members of the local population. 


Location: Clydebank

Main contractor: bam

Architect: Anderson Bell Christie

Aspex supplied: Internal timber doorsets, protective screens and ironmongery.

Products featured in this case study

View all products (10)
Integra Severe Duty Doorset

Integra Severe Duty Doorset

Integra Architectural Ironmongery

Integra Architectural Ironmongery

More case studies from Aspex UK Limited

View all case studies (54)
Macclesfield Town Hall - Restoration

Macclesfield Town Hall - Restoration

Sidney Stringer Academy - Education

Sidney Stringer Academy - Education

2012 London Olympics Athletes Village - Accommodation

2012 London Olympics Athletes Village - Accommodation

Chelsea Barracks - Residential

Chelsea Barracks - Residential

More case studies from Wood doorsets

View all case studies (50)
Battersea Power Station

Battersea Power Station

Emaar Address Residence Skyview Terraces

Emaar Address Residence Skyview Terraces

University Arms Hotel

University Arms Hotel

Skelbrooke Seclusion Suite

Skelbrooke Seclusion Suite

More case studies from Door hardware systems

View all case studies (49)
26-31 Charlotte Street

26-31 Charlotte Street

Hodge House

Hodge House

RHS Bridgewater

RHS Bridgewater

Spitfire Studios

Spitfire Studios