This case study is no longer available.
OVERVIEW
This Church had Topseal Direct Lay applied to its two flat roof areas. One area was concrete and the other was asphalt. During the contract the building remained open with no disruption caused. Complete with a 20 year guarantee.
Contact Topseal Systems Ltd by clicking the button below to find out which products were used in this case study.
Sedum Green Roof Case Study
Topseal PU hotel roof
Topseal PU hospital overlay roof
Blackpool Public Convenience