OVERVIEW
Project Overview:
In response to the council’s initiative to revamp pedestrian areas for enhanced safety and aesthetic appeal, Castle Street in Trowbridge embarked on a significant renovation project. Central to this endeavour was the installation of a 952m² of pedestrian walkways, necessitating meticulous planning and execution. The project specifications stated an 18mm depth for the surfacing material, with a specific colour requirement of 6mm Barley Butter, was approved for use in Castle Street.
Client Requirements:
The Castle Street Authority outlined specific specification requirements for the pedestrian areas. The areas encompassed a total of 952m² of footways with consistent depth of 18mm for the resin bound surfacing material to be installed and ensure durability and uniformity across the area. Use of our popular 6mm Barley Butter colour, was approved for Castle Street to maintain aesthetic coherence with the surroundings.
Challenges:
Several challenges were anticipated during the planning and execution phases of the project. Precision in depth, achieving and maintaining the specified depth of 18mm uniformly across the entire area demanded careful attention to detail. It was important to maintain colour consistency of the approved Barley Butter natural aggregate throughout the installation process as this was crucial to meeting client expectations and maintaining the area's aesthetic integrity. Adhering to the project timeline was imperative to minimise disruption to pedestrian traffic and to ensure timely completion.
Solution:
To address the challenges and fulfil client requirements, various steps were implemented. The high-quality material selection met the specified depth requirements procured, ensuring durability and longevity. The consistent application of the approved Barley Butter colour and stringent quality control measures maintained colour uniformity during installation. Our experienced Approved Installers MJS Surfacing utilised the advanced mechanical equipment and resin bound techniques to achieve the depth of 18mm uniformly across the pedestrian area. A dedicated SureSet project management team oversaw the entire process, closely monitoring progress to ensure adherence to the established timeline.
Installation of Resin Bound:
The installation commenced with thorough site preparation, including surface levelling and proper drainage provisions. Specialised equipment was utilised to apply the surfacing material uniformly to the specified depth. Experienced technicians meticulously applied the resin bound Barley Butter colour, ensuring consistency throughout the area. Rigorous quality control inspections were conducted at various stages to maintain our high quality standards.
The Result:
The Castle Street pedestrian areas were completed successfully, meeting all client requirements and surpassing expectations. The 952m² area now boasts a durable and visually appealing surface, enhancing the overall ambiance of Castle Street. The application of the approved Barley Butter colour adds a touch of tidy elegance while maintaining harmony with the surrounding environment. The project's timely completion minimised disruption to pedestrian traffic, earning accolades from the local community and local authorities alike.
Conclusion:
The resin bound pedestrian area installation exemplifies the successful collaboration between stakeholders, meticulous planning, and precise execution. By overcoming various challenges and adhering to strict standards, the project not only met but exceeded client expectations. The revitalised pedestrian area stands as a testament to the commitment to quality and excellence, enhancing the urban landscape of Castle Street, Trowbridge.
Contact SureSet Resin Systems by clicking the button below to find out which products were used in this case study.
Residential installation near Bath
Wickmead Care Home
Grange Farm Centre, Chigwell
St Laurence School, Bradford on Avon