by IKO PLC
The Grade I listed Round Tower (dating from the 1400’s) is a fortification at the entrance to Portsmouth harbour it overhangs the Portsmouth sea front making it susceptible to coastal weather. It’s current waterproofing system needed replacing, The IKO Permaphalt System was chosen due to the 20 year guarantee it offered and the previous heritage projects IKO have successfully helped preserve with various waterproof solutions. Existing coverings were removed and replaced by Southern Flat Roofing & Pitched Roofing Ltd, providing a surface that would withstand constant foot traffic as well as the weather that many seafront structures suffer from.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station