NBS Source
I'm a manufacturer

This case study is no longer available.

Bright Building, Manchester

OVERVIEW

The cantilevering form of a visually distinctive "Saw-Tooth" facade to the Bright Building on Manchester Science Park brought enthusiastic approval for the designers and specialist cladding contractors who created the enclosure using one of WICONA's well-proven system 

Constructed for the Bruntwood Estate with the Manchester Office of BDP leading the design team, Bradford based Quest Solutions were the fabricator who carried out the design, manufacture and installation of the curtain walling and window package for this project. 

Following analysis of the challenges presented by the scale and complexity of the curtain wall envisages - including the weight of the glass units the 12.5m tall feature would carry - it was determined that WICTEC SG system was the most suitable choice. 

No featured products in this case study

Contact WICONA by clicking the button below to find out which products were used in this case study.