A bespoke performance and school stage was installed at the Baysgarth School. A full theatre setup was installed which included curtains and backdrops as well as sound and lighting systems. 40 Alu Rapid platforms were installed with oak veneered fascias, steps and integrated socket boxes.
Contact CPS Manufacturing Co LLP by clicking the button below to find out which products were used in this case study.
Alexandra Palace Theatre Restoration Seating, Orchestra Pit and Staging
Villa Cross Church of God Prophecy Auditorium Seating
Exeter Cathedral Staging
2012 Olympic Games Media Centre Auditorium Seating and Staging