Briggs Amasco designed, supplied and installed a mastic asphalt roadway without hindrance to other on-site trades with a 40 mm Permapark asphalt application providing long term protection to the Permatec Waterproofing installed to the haul roads at the Battersea Project London.
The Permatec waterproofing was required to be installed early to allow the installation of the energy centre below podium level, it was determined pre-contract that the waterproofing would not be able to withstand the high traffic loads that would transit the podium during construction, various protection methods were reviewed and Mastic Asphalt was the only product...